| 404220332 | Form 17 | 5/16/2025 | 5/28/2025 | PLUNGER LIFT | 30 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 482 | 474 | No | -- | -- | Annual Test. 30 PSI blew down to 0 PSI within ten minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867502 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 45 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 523 | 523 | No | -- | -- | Annual test. 45 PSI water and gas flow blew down to 0 PSI in seconds, water continued to trickle for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/20/2023 | 9/25/2023 | Plunger Lift | 15 | Down to Zero | -- | 0 | Down to Zero | 433 | 429 | No | No | No | Annual Test. 15 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/20/2022 | 7/6/2022 | | 19 | Down to Zero | -- | 0 | Down to Zero | 320 | 371 | No | None | None | |
| Click for Specifics | Full | 7/20/2021 | 11/1/2021 | | 12 | Whisper (very low flow) | -- | 0 | No Flow | 518 | 516 | No | None | None | |
| 402447735 | Form 17 | 3/12/2020 | 7/21/2020 | | 71 | CONTINUOUS | -- | 0 | DOWN TO 0 | 823 | 824 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402034568 | Form 17 | 4/25/2019 | 5/7/2019 | FLOWING | 604 | CONTINUOUS | -- | 3 | WHISPER | 2717 | 2716 | Yes | -- | -- | 604 PSI blew down to 3 PSI instantly slight whisper throughout the test, PDC has collected a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |