| 404304728 | Form 17 | 7/15/2025 | 8/4/2025 | PLUNGER LIFT | 60 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 630 | 633 | No | -- | -- | Remediation follow up test. 60 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867462 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 68 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 434 | 436 | No | -- | -- | Annual test. 68 PSI water and gas flow blew down to 0 PSI in seconds, water continued to drip for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403536893 | Form 17 | 9/20/2023 | 9/21/2023 | PLUNGER LIFT | 54 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 533 | 532 | No | -- | -- | Annual test. 54 PSI water and gas flow blew down to 0 PSI in 3.5 minutes. No flow or pressure until 18 minute mark when light trickle of fluid started again. ~2.5 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403084635 | Form 17 | 6/20/2022 | 6/21/2022 | PLUNGER LIFT | 56 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 417 | 417 | Yes | -- | -- | Annual Test, 56 PSI water and gas flow blew down to 0 PSI within first minute of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC collected a sample 6/8/2022 and will submit results via form 43 as soon as possible. PDC will continue to monitor monthly. |
| 402719997 | Form 17 | 5/6/2021 | 6/16/2021 | PLUNGER LIFT | 7 | WHISPER | WATER AND VAPOR | 0 | | 524 | 524 | No | -- | -- | Abatement system follow up test, 7 PSI whisper blew down to 0 PSI within first five minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402545043 | Form 17 | 11/13/2020 | 12/2/2020 | FLOWING | 57 | WHISPER | GAS | 0 | NO FLOW | 587 | 587 | No | -- | -- | Abatement System Follow up Test, 57 PSI slight gas blew down to 0 PSI within first 5 minute of test. No pressure or flow observed for the remainder of the test. |
| 402456097 | Form 17 | 3/12/2020 | 7/29/2020 | FLOWING | 133 | GAS | -- | 0 | NO FLOW | 741 | 741 | No | -- | -- | Abatement System Follow up test, 133 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
| 402035966 | Form 17 | 4/25/2019 | 5/8/2019 | FLOWING | 165 | CONTINUOUS | -- | 0 | NO FLOW | 2007 | 2007 | No | -- | -- | 165 PSI blew down to 0 PSI within first 5 minutes, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
| 401760526 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 200 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test 200 PSI blew down to 0 within seconds, no flow or pressure for duration of test |