| 404304758 | Form 17 | 7/15/2025 | 8/4/2025 | PLUNGER LIFT | 74 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 584 | 584 | No | -- | -- | Remediation follow up test. 74 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867471 | Form 17 | 7/23/2024 | 7/26/2024 | SHUT-IN | 137 | DOWN TO 0 | WATER AND GAS | 107 | CONTINUOUS | 516 | 516 | No | -- | -- | Annual test. 137 PSI gas and water flow for first 5 minutes, continuous water flow for the remainder of the test, ~4 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403536884 | Form 17 | 9/20/2023 | 9/21/2023 | PLUNGER LIFT | 51 | CONTINUOUS | WATER AND GAS | 2 | CONTINUOUS | 539 | 529 | No | -- | -- | Annual test. 51 PSI water and gas flow blew down to 2 PSI in 30 minutes, ~10 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403096589 | Form 17 | 6/20/2022 | 7/5/2022 | SHUT-IN | 43 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 470 | 470 | No | -- | -- | Annual Test, 43 PSI blew down to 0 PSI within first few seconds of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC will continue to monitor monthly. |
| 402720006 | Form 17 | 4/25/2021 | 6/16/2021 | FLOWING | 10 | NO FLOW | -- | 0 | | 537 | 537 | No | -- | -- | Abatement system follow up test, 10 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402544976 | Form 17 | 11/13/2020 | 12/2/2020 | FLOWING | 81 | CONTINUOUS | GAS | 0 | NO FLOW | 626 | 595 | No | -- | -- | Abatement System Follow up Test, 81 PSI slight gas blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test. |
| 402456086 | Form 17 | 3/12/2020 | 7/29/2020 | FLOWING | 108 | GAS | -- | 1 | WHISPER | 758 | 759 | Yes | Yes | -- | Abatement System Follow up test, 108 PSI slight gas flow blew down to 1 PSI whisper at the end of the 30 min test. PDC will collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
| 402019889 | Form 17 | 4/1/2019 | 4/24/2019 | FLOWING | 246 | WHISPER | -- | 0 | NO FLOW | 2045 | 2043 | No | -- | -- | Post Production Test, 246 PSI slight whisper blew down to 0 PSI within minutes. No flow or pressure for the duration of test. PDC will submit a sundry detailing a proposed remediation plan |
| 401760542 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 205 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test, 205 PSI blew down to 0 PSi within seconds. No flow or pressure for remainder of test |