Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44856Geib
26V-304
PDC ENERGY INC
69175
PR
10/1/2025
WATTENBERG
90750
WELD  123
NENE 26 5N65W 6
450654
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1631 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404304758Form 177/15/20258/4/2025PLUNGER LIFT74DOWN TO 0 WATER AND GAS0 CONTINUOUS 584584No----Remediation follow up test. 74 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403867471Form 177/23/20247/26/2024SHUT-IN137DOWN TO 0 WATER AND GAS107 CONTINUOUS 516516No----Annual test. 137 PSI gas and water flow for first 5 minutes, continuous water flow for the remainder of the test, ~4 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy.
403536884Form 179/20/20239/21/2023PLUNGER LIFT51CONTINUOUS WATER AND GAS2 CONTINUOUS 539529No----Annual test. 51 PSI water and gas flow blew down to 2 PSI in 30 minutes, ~10 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy.
403096589Form 176/20/20227/5/2022SHUT-IN43CONTINUOUS WATER AND GAS0 CONTINUOUS 470470No----Annual Test, 43 PSI blew down to 0 PSI within first few seconds of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC will continue to monitor monthly.
402720006Form 174/25/20216/16/2021FLOWING10NO FLOW --0  537537No----Abatement system follow up test, 10 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402544976Form 1711/13/202012/2/2020FLOWING81CONTINUOUS GAS0 NO FLOW 626595No----Abatement System Follow up Test, 81 PSI slight gas blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test.
402456086Form 173/12/20207/29/2020FLOWING108GAS --1 WHISPER 758759YesYes--Abatement System Follow up test, 108 PSI slight gas flow blew down to 1 PSI whisper at the end of the 30 min test. PDC will collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months.
402019889Form 174/1/20194/24/2019FLOWING246WHISPER --0 NO FLOW 20452043No----Post Production Test, 246 PSI slight whisper blew down to 0 PSI within minutes. No flow or pressure for the duration of test. PDC will submit a sundry detailing a proposed remediation plan
401760542Form 177/29/20189/12/2018SHUT-IN205DOWN TO 0 --0 NO FLOW 00No----Post TD test, 205 PSI blew down to 0 PSi within seconds. No flow or pressure for remainder of test