Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44855Geib
26U-234
PDC ENERGY INC
69175
PR
9/1/2024
WATTENBERG
90750
WELD  123
NENE 26 5N65W 6
450654
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1647 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404292898Form 177/14/20257/24/2025PLUNGER LIFT133SURGE WATER AND GAS14 SURGE 669678No----Remediation follow up test. 133 PSI continuous gas and water flow blew down to 14 PSI within thirty minutes. Gas and water observed throughout the entire test. ~20 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403867092Form 177/23/20247/26/2024PLUNGER LIFT260CONTINUOUS GAS73 CONTINUOUS 407401No----Annual test. 260 PSI gas flow blew down to 0 PSI within first 5 minutes. After 10 minute mark strong gas flow started again and lasted for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull9/20/20239/25/2023Plunger Lift18Down to Zero--0Down to Zero827826NoNoNoAnnual Test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/20/20227/6/2022 0Down to Zero--0Down to Zero411410NoNoneNone 
402897958Form 175/6/202112/14/2021PLUNGER LIFT4DOWN TO 0 GAS0 NO FLOW 567567No----Abatement system follow up test, 4 PSI whisper gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402694132Form 1711/13/20205/19/2021SHUT-IN109CONTINUOUS GAS0 NO FLOW 634634No----Abatement system follow up test, 109 PSI 205 PSI slight gas blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test
402423954Form 173/12/20206/16/2020 7NO FLOW --0 NO FLOW 786787No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402035991Form 174/25/20195/8/2019FLOWING124DOWN TO 0 --0 NO FLOW 18691869No----124 PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure.
401760516Form 177/29/20189/12/2018SHUT-IN220DOWN TO 0 --0 NO FLOW 00No----Post TD test 220 PSI blew down within first minute of test, no pressure or flow for suration of test