| 404292898 | Form 17 | 7/14/2025 | 7/24/2025 | PLUNGER LIFT | 133 | SURGE | WATER AND GAS | 14 | SURGE | 669 | 678 | No | -- | -- | Remediation follow up test. 133 PSI continuous gas and water flow blew down to 14 PSI within thirty minutes. Gas and water observed throughout the entire test. ~20 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867092 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 260 | CONTINUOUS | GAS | 73 | CONTINUOUS | 407 | 401 | No | -- | -- | Annual test. 260 PSI gas flow blew down to 0 PSI within first 5 minutes. After 10 minute mark strong gas flow started again and lasted for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/20/2023 | 9/25/2023 | Plunger Lift | 18 | Down to Zero | -- | 0 | Down to Zero | 827 | 826 | No | No | No | Annual Test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/20/2022 | 7/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 411 | 410 | No | None | None | |
| 402897958 | Form 17 | 5/6/2021 | 12/14/2021 | PLUNGER LIFT | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 567 | 567 | No | -- | -- | Abatement system follow up test, 4 PSI whisper gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402694132 | Form 17 | 11/13/2020 | 5/19/2021 | SHUT-IN | 109 | CONTINUOUS | GAS | 0 | NO FLOW | 634 | 634 | No | -- | -- | Abatement system follow up test, 109 PSI 205 PSI slight gas blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test |
| 402423954 | Form 17 | 3/12/2020 | 6/16/2020 | | 7 | NO FLOW | -- | 0 | NO FLOW | 786 | 787 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402035991 | Form 17 | 4/25/2019 | 5/8/2019 | FLOWING | 124 | DOWN TO 0 | -- | 0 | NO FLOW | 1869 | 1869 | No | -- | -- | 124 PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
| 401760516 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 220 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test 220 PSI blew down within first minute of test, no pressure or flow for suration of test |