Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44519BUTTERBALL
32C-34HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
3/26/2018
WATTENBERG
90750
WELD  123
NWNW 10 2N67W 6
330770
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1845 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull7/12/20248/20/2024 1WhisperNone--No Flow414430NoNN Surface Casing produced no liquid.
Click for SpecificsFull8/25/20239/11/2023Plunger Lift1WhisperNone--No Flow236251NoNN Surface Casing produced no liquid.
Click for SpecificsFull10/7/202211/8/2022Plunger Lift2ContinuousNone--No Flow263262NoNN Surface Casing produced no liquid.
Click for SpecificsFull7/1/202112/21/2021Plunger Lift4ContinuousNone--No Flow413424NoNN Surface Casing produced no liquid.
Click for SpecificsFull5/18/202011/2/2020 4Continuous Flow 0Down To Zero10131014NoNoNo Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull11/25/201912/20/2019 22Gas--1Gas691659NoNoNoSurface casing produced no liquids.
401815001Form 1710/24/201810/29/2018 1WHISPER --0 DOWN TO 0 13091309No----SURFACE CASING PRODUCED NO FLUIDS. SHUT IN FOR 15 MIN; ENDED WITH A WHISPER.
401611044Form 174/12/20184/17/2018 67GAS --0 DOWN TO 0 26322639No----Surface casing produced no fluids. Surface casing shut in for 15 min ended with 6 PSI. Post turn on to sales form 17.
401513949Form 171/3/20181/15/2018 15GAS --0 DOWN TO 0 00No----Surface casing produced no fluids. Surface casing shut in for 15 min ended with a whisper. Production casing was dead at the start of test. Drilled and uncompleted form 17.
401388164Form 178/24/20178/25/2017 121GAS --1 WHISPER ----No----PRODUCTION CASING WAS ON A VACUUM. SURFACE CASING PRODUCED NO FLUIDS. BLEW DOWN SURFACE CASING AN EXTRA 30 MIN; ENDED WITH A WHISPER OF GAS. SURFACE CASING SHUT-IN FOR 15 MIN; ENDED WITH 14 PSI