Click for Specifics | Light | 3/24/2024 | 4/23/2024 | | 10 | | -- | 0 | | 536 | 536 | No | No | No | |
Click for Specifics | Light | 3/9/2023 | 4/10/2023 | Plunger Lift | 0 | | -- | 0 | | 492 | 493 | No | No | No | |
Click for Specifics | Light | 3/23/2022 | 4/18/2022 | Plunger Lift | 48 | | -- | 0 | | 639 | 641 | No | No | No | |
Click for Specifics | Full | 1/8/2021 | 1/25/2021 | | 35 | Down to Zero | -- | 0 | No Flow | 1066 | 1073 | No | No | No | Surface casing pressure blew down to 0 psi in 10 seconds, produced only gas. |
Click for Specifics | Full | 2/4/2020 | 2/17/2020 | | 16 | DOWN TO 0 | -- | 0 | NO FLOW | 1933 | 1933 | No | No | No | Surface casing blew down to 0 psi in 3 seconds, only gas. |
Click for Specifics | Light | 10/21/2019 | 12/18/2019 | | 14 | | -- | 0 | Down To Zero | 3192 | 3193 | No | No | No | Surface casing blew down to 0 psi in 5 seconds, only gas. |
Click for Specifics | Light | 10/21/2019 | | | 14 | | -- | 0 | Down To Zero | 3192 | 3193 | No | No | No | |
402394007 | Form 17 | 10/21/2019 | 5/8/2020 | FLOWING | 14 | DOWN TO 0 | -- | 0 | NO FLOW | 3192 | 3193 | No | -- | -- | Test was previously bulk uploaded, submitting hard copy for first production requirement. Blew down to zero only gas |
402049086 | Form 17 | 5/15/2019 | 5/20/2019 | SHUT-IN | 9 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-frac BHT. Surface casing blew down to 0 psi in 52 seconds, only gas. |
401750171 | Form 17 | 8/15/2018 | 8/30/2018 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test per form 2 COA. Well is treed up for frac. No means of gauging production casing pressure.
No flow, no pressure. |