Click for Specifics | Light | 3/24/2024 | 4/23/2024 | | 42 | | -- | 0 | | 447 | 445 | No | No | No | |
Click for Specifics | Light | 3/9/2023 | 4/10/2023 | Plunger Lift | 32 | | -- | 0 | | 549 | 549 | No | No | No | |
403052758 | Form 17 | 5/17/2022 | 5/18/2022 | FLOWING | 6 | DOWN TO 0 | GAS | 0 | NO FLOW | 675 | 675 | No | -- | -- | Mid-mitigation Bradenhead test.
WBD submitted on doc#402232528
Gas. Well went blew down to 0 in 2 seconds.
|
402880307 | Form 17 | 11/22/2021 | 12/8/2021 | FLOWING | 84 | DOWN TO 0 | GAS | 0 | NO FLOW | 767 | 768 | No | -- | -- | |
Click for Specifics | Full | 1/8/2021 | 1/25/2021 | | 49 | Down to Zero | -- | 0 | No Flow | 1170 | 1173 | No | No | No | Surface casing pressure blew down to 0 psi in 20 seconds, produced only gas |
402505124 | Form 17 | 10/5/2020 | 10/7/2020 | | 21 | DOWN TO 0 | -- | 0 | NO FLOW | 1380 | 1380 | No | -- | -- | Surface casing pressure blew down to 0 psi in 10 seconds, produced only gas. |
Click for Specifics | Full | 2/4/2020 | 2/17/2020 | | 88 | DOWN TO 0 | -- | 0 | NO FLOW | 1980 | 1980 | Yes | Yes | No | Surface casing blew down to 0 psi in 15 seconds, only gas. |
402344511 | Form 17 | 2/4/2020 | 3/17/2020 | FLOWING | 88 | DOWN TO 0 | -- | 0 | NO FLOW | 1980 | 1980 | Yes | -- | -- | *Test was also bulk uploaded. |
402393982 | Form 17 | 10/21/2019 | 5/8/2020 | FLOWING | 256 | DOWN TO 0 | -- | 0 | NO FLOW | 3153 | 3155 | Yes | -- | -- | Test was previously bulk uploaded, submitting hard copy for first production requirement. Blew down to zero only gas. Well is already under abatement. |
Click for Specifics | Full | 10/21/2019 | | | 256 | Down To Zero | -- | 0 | No Flow | 3153 | 3155 | Yes | Yes | No | Surface casing blew down to 0 psi in 40 seconds, only gas. |
402048011 | Form 17 | 5/14/2019 | 5/17/2019 | SHUT-IN | 151 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-frac BHT. Surface casing blew down to 0 psi in 1:30, only gas. |
401750235 | Form 17 | 8/13/2018 | 8/30/2018 | SHUT-IN | 52 | GAS | -- | 0 | DOWN TO 0 | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test per form 2 COA. Well is treed up for frac. No means of gauging production casing pressure. |