Click for Specifics | Light | 3/24/2024 | 4/23/2024 | | 39 | | -- | 0 | | 478 | 478 | No | No | No | |
Click for Specifics | Light | 3/9/2023 | 4/10/2023 | Plunger Lift | 44 | | -- | 0 | | 535 | 536 | No | No | No | |
403082810 | Form 17 | 6/16/2022 | 6/20/2022 | FLOWING | 11 | DOWN TO 0 | GAS | 0 | NO FLOW | 601 | 601 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 402232539 |
402880309 | Form 17 | 11/22/2021 | 11/29/2021 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 729 | 728 | No | -- | -- | |
402717025 | Form 17 | 5/20/2021 | 6/14/2021 | FLOWING | 64 | DOWN TO 0 | GAS | 0 | NO FLOW | 950 | 950 | No | -- | -- | Blew down to zero in less than 5 seconds. Not enough volume to sample.
Test input slipped through somehow, caught on audit. Apologies for the tardiness of this submission. |
Click for Specifics | Full | 5/20/2021 | 6/21/2021 | | 64 | DOWN TO 0 | -- | 0 | NO FLOW | 950 | 950 | No | NO | No | Blew down to zero in less than 5 seconds. Not enough volume for sample. |
402505071 | Form 17 | 10/5/2020 | 10/7/2020 | | 33 | DOWN TO 0 | -- | 0 | NO FLOW | 1308 | 1310 | No | -- | -- | Surface casing pressure blew down to 0 psi in 5 seconds, produced only gas. |
402344526 | Form 17 | 2/4/2020 | 3/17/2020 | FLOWING | 101 | DOWN TO 0 | -- | 0 | NO FLOW | 1933 | 1935 | Yes | -- | -- | *Bradenhead test was previously bulk uploaded. |
Click for Specifics | Full | 2/4/2020 | 2/17/2020 | | 101 | DOWN TO 0 | -- | 0 | NO FLOW | 1933 | 1935 | Yes | Yes | No | Surface casing blew down to 0 psi in 13 seconds, only gas. |
402393986 | Form 17 | 10/21/2019 | 5/8/2020 | FLOWING | 414 | DOWN TO 0 | -- | 414 | NO FLOW | 3167 | 3168 | Yes | -- | -- | Test was previously bulk uploaded, submitting hard copy for first production requirement. Blew down to zero only gas |
Click for Specifics | Full | 10/21/2019 | | | 414 | Down To Zero | -- | 0 | No Flow | 3167 | 3168 | Yes | Yes | No | Surface casing blew down to 0 psi in 1:25, only gas. |
402046386 | Form 17 | 5/15/2019 | 5/16/2019 | SHUT-IN | 502 | GAS | -- | 0 | NO FLOW | 0 | 0 | Yes | Yes | -- | Pre-frac bradenhead test, tubing and production casing inaccessible. Surface casing blew down to 0 psi in 7 minutes, only gas. Gas sample taken. |
401750246 | Form 17 | 8/15/2018 | 8/30/2018 | SHUT-IN | 52 | GAS | -- | 0 | DOWN TO 0 | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test per form 2 COA. Well is treed up for frac. No means of gauging production casing pressure.
No fluid from surface, blew down to 0 psi in 15 seconds |