403879702 | Form 17 | 8/1/2024 | 8/7/2024 | PLUNGER LIFT | 28 | CONTINUOUS | WATER AND GAS | 11 | CONTINUOUS | 425 | 433 | No | -- | -- | Annual test. 28 PSI continuous water and gas flow blew down to 11 PSI in 30 minutes, ~4 gallons of fluid total. PDC will monitor pressure and re-test according to bradenhead policy. |
403539678 | Form 17 | 9/19/2023 | 9/25/2023 | PLUNGER LIFT | 14 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 451 | 447 | Yes | -- | -- | Annual Test. 14 PSI water and gas flow blew down to 0 PSI within first minute of test. Water dripped for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 1/24/2022 | 2/21/2022 | | 13 | Down to Zero | -- | 0 | Down to Zero | 351 | 352 | No | No | No | |
Click for Specifics | Full | 4/12/2021 | 12/21/2021 | | 5 | Down to Zero | None | 1 | No Flow | 480 | 576 | No | None | None | |
402447692 | Form 17 | 4/11/2020 | 7/21/2020 | | 81 | WATER H20 | -- | 0 | NO FLOW | 781 | 781 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402034339 | Form 17 | 4/26/2019 | 5/7/2019 | FLOWING | 160 | DOWN TO 0 | -- | 0 | NO FLOW | 2711 | 2711 | No | -- | -- | 160 PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
402016508 | Form 17 | 3/7/2019 | 4/22/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test, no pressure or fluid for duration of test |
401613106 | Form 17 | 4/12/2018 | 4/18/2018 | SHUT-IN | 90 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test 90 PSI blew down to 0 PSI within first minute, no flow or pressure for remainder of test |