Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44092Bunting
26P-412
PDC ENERGY INC
69175
PR
12/1/2024
WATTENBERG
90750
WELD  123
SWSE 26 5N65W 6
448963
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1673 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull7/31/20248/6/2024 11Down to Zero--0No Flow482482NoNoNoAnnual Test. 11 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull9/19/20239/25/2023Plunger Lift14Down to Zero--0Down to Zero361357NoNoNoAnnual Test. 14 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull9/6/202210/10/2022 27Down to Zero--0No Flow369373NoNoneNone 
Click for SpecificsFull4/16/202111/1/2021 5Water H2O--0Gas546542NoNoneNone 
402463891Form 173/26/20208/11/2020 75GAS --0 NO FLOW 765770No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402456076Form 173/26/20207/29/2020FLOWING75GAS --0 NO FLOW 765765No----Abatement System Follow up test, 75 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months.
402016534Form 174/26/20195/6/2019FLOWING105DOWN TO 0 --0 NO FLOW 15861580No----Annual Test, 105 PSI blew own to 0 PSI instantly, no flow or pressure for the duration of test. PDC will follow up with a sundry including a remediation proposal.
402016533Form 173/7/20184/22/2019SHUT-IN20DOWN TO 0 --0 NO FLOW 00No----Post TD test 20 PSI down to 0 PSI within seconds. No flow or pressure for the rest of the test