Click for Specifics | Full | 7/31/2024 | 8/6/2024 | | 11 | Down to Zero | -- | 0 | No Flow | 482 | 482 | No | No | No | Annual Test. 11 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/19/2023 | 9/25/2023 | Plunger Lift | 14 | Down to Zero | -- | 0 | Down to Zero | 361 | 357 | No | No | No | Annual Test. 14 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/6/2022 | 10/10/2022 | | 27 | Down to Zero | -- | 0 | No Flow | 369 | 373 | No | None | None | |
Click for Specifics | Full | 4/16/2021 | 11/1/2021 | | 5 | Water H2O | -- | 0 | Gas | 546 | 542 | No | None | None | |
402463891 | Form 17 | 3/26/2020 | 8/11/2020 | | 75 | GAS | -- | 0 | NO FLOW | 765 | 770 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402456076 | Form 17 | 3/26/2020 | 7/29/2020 | FLOWING | 75 | GAS | -- | 0 | NO FLOW | 765 | 765 | No | -- | -- | Abatement System Follow up test, 75 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
402016534 | Form 17 | 4/26/2019 | 5/6/2019 | FLOWING | 105 | DOWN TO 0 | -- | 0 | NO FLOW | 1586 | 1580 | No | -- | -- | Annual Test, 105 PSI blew own to 0 PSI instantly, no flow or pressure for the duration of test. PDC will follow up with a sundry including a remediation proposal. |
402016533 | Form 17 | 3/7/2018 | 4/22/2019 | SHUT-IN | 20 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test 20 PSI down to 0 PSI within seconds. No flow or pressure for the rest of the test |