Click for Specifics | Full | 7/31/2024 | 8/6/2024 | | 42 | Down to Zero | -- | 0 | No Flow | 338 | 348 | No | No | No | Annual Test. 42 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/19/2023 | 9/25/2023 | Plunger Lift | 28 | Down to Zero | -- | 0 | Down to Zero | 375 | 375 | No | No | No | Annual Test. 28 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 1/24/2022 | 2/21/2022 | | 32 | Down to Zero | -- | 0 | Down to Zero | 442 | 448 | No | No | No | |
Click for Specifics | Full | 4/16/2021 | 12/21/2021 | | 0 | Down to Zero | None | 1 | No Flow | 569 | 568 | No | None | None | |
402447625 | Form 17 | 4/11/2020 | 7/21/2020 | | 74 | DOWN TO 0 | -- | 0 | WATER H20 | 846 | 845 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402108649 | Form 17 | 5/28/2019 | 7/15/2019 | FLOWING | 155 | DOWN TO 0 | -- | 0 | NO FLOW | 2173 | 2173 | No | -- | -- | 60 days post production test 155 PSI blew down to 0 PSI within 10 seconds, no pressure or flow observed for the remainder of the 30 min test. PDC will attempt to collect a sample and submit a remediation plan via sundry |
402016511 | Form 17 | 3/7/2019 | 4/22/2019 | SHUT-IN | 10 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test, 10 PSI blew down instantly to 0 PSI no flow or pressure for remainder of test |