403877263 | Form 17 | 7/31/2024 | 8/5/2024 | PLUNGER LIFT | 52 | CONTINUOUS | WATER AND GAS | 19 | CONTINUOUS | 420 | 420 | No | -- | -- | Annual test. 52 PSI continuous gas and water flow blew down to 19 PSI in 30 minutes, ~5 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/19/2023 | 9/25/2023 | Plunger Lift | 16 | Down to Zero | -- | 0 | Down to Zero | 342 | 342 | No | No | No | Annual Test. 16 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/6/2022 | 10/10/2022 | | 42 | Down to Zero | -- | 0 | No Flow | 364 | 364 | No | None | None | |
Click for Specifics | Full | 4/15/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 531 | 485 | No | None | None | |
402447620 | Form 17 | 4/11/2020 | 7/21/2020 | | 95 | WATER H20 | -- | 0 | WATER H20 | 748 | 746 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402031750 | Form 17 | 4/26/2019 | 5/3/2019 | FLOWING | 90 | DOWN TO 0 | -- | 0 | NO FLOW | 2013 | 2013 | No | -- | -- | Bradenhead test 90 PSI blew down to 0 PSI instantly. no flow or pressure for the duration of test. PDC will follow up iwth a sundry proposing a remediation plan |
401612960 | Form 17 | 4/12/2018 | 4/18/2018 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test no flow or pressure |