WELL05-123-43894Cecils Kersey Farm
17B-304
PDC ENERGY INC
69175
PR
8/1/2023
WATTENBERG
90750
KERSEY/WELD  123
NWSW 17 5N64W 6
445139
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1668 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull5/17/20245/30/2024 13Whisper (very low flow)--0Down to Zero231229NoNoNoAnnual Test.  13 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403391210Form 175/1/20235/2/2023PLUNGER LIFT153WHISPER GAS8 WHISPER 338340Yes----Abatement system follow up test. 153 PSI whisper gas blew down to 8 PSI in 30 minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly, a sample was collected 02/02/2023.
403227658Form 1711/10/202211/14/2022SHUT-IN86DOWN TO 0 GAS0 NO FLOW 344344Yes----Abatement system follow up test. 86 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403035747Form 175/2/20225/3/2022SHUT-IN102CONTINUOUS GAS0 NO FLOW 372372Yes----Abatement system follow up test, 102 PSI slight gas flow blew down to 0 PSI within first 20 minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402830428Form 179/28/202110/4/2021 134WHISPER GAS AND VAPOR0 NO FLOW 430430Yes----Annual Test, 134 PSI slight gas blew down to 0 PSI within first 10 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly
402425186Form 172/14/20206/17/2020 3DOWN TO 0 --0 NO FLOW 409405No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402114759Form 176/30/20197/18/2019FLOWING225DOWN TO 0 --0 NO FLOW 585585No----Annual Test 225 PSI blew down to 0 PSI in seconds. No pressure or flow observed for the duration of the 30 min test, PDC will attempt to collect a sample and submit via form 43. PDC has submitted a remediation plan via sundry
401347772Form 177/14/20177/19/2017SHUT-IN800DOWN TO 0 --0 NO FLOW 00No----Pre Completion Test initial pressure 800 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test
401327853Form 175/15/20176/29/2017SHUT-IN700DOWN TO 0 --0 NO FLOW 00No----Pre Completion test. Initial pressure was 700 PSI, instantly blew down within first minute of test to 0 PSI. No pressure for remainder of test. Attempted to collect sample but were unable to due instant blow down.