403798238 | Form 17 | 5/15/2024 | 5/21/2024 | | 37 | WHISPER | GAS | 0 | NO FLOW | 211 | 211 | No | -- | -- | Remediation Follow up test. 37 PSI gas blew down to 0 PSI in 40 seconds and turned to a whisper for 1 minute after that there was no pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/23/2023 | 5/29/2023 | | 8 | Down to Zero | -- | 0 | No Flow | 235 | 235 | No | None | None | Annual Test. 8 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403153752 | Form 17 | 8/31/2022 | 9/1/2022 | PLUNGER LIFT | 124 | DOWN TO 0 | GAS | 0 | NO FLOW | 282 | 297 | Yes | -- | -- | Annual Test. 124 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
|
Click for Specifics | Full | 3/9/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 367 | 361 | No | None | None | |
402420913 | Form 17 | 5/12/2020 | 6/12/2020 | | 42 | DOWN TO 0 | -- | 0 | NO FLOW | 468 | 469 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402406896 | Form 17 | 5/12/2020 | 5/27/2020 | | 42 | NO FLOW | -- | 0 | NO FLOW | 468 | 469 | No | -- | -- | Annual Test 42 PSI with continuous flow, blew down to 0 PSI after 30 min. |
402439257 | Form 17 | 4/25/2020 | 7/8/2020 | | 63 | NO FLOW | -- | 0 | NO FLOW | 477 | 476 | No | -- | -- | Annual Test 63 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
402240209 | Form 17 | 11/11/2019 | 11/14/2019 | FLOWING | 358 | GAS | -- | 0 | NO FLOW | 820 | 820 | No | -- | -- | Annual Test 358 PSI blew down to 0 PSI within forst minute of test. No pressure or flow observed for the remainder of the 30 min test. PDC will attempt to collect a sample and submit results via form 43. PDC will submit a remediation plan via sundry as soon as possible. |