Click for Specifics | Full | 5/15/2024 | 5/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 257 | 258 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
403473962 | Form 17 | 7/24/2023 | 7/24/2023 | PLUNGER LIFT | 5 | WHISPER | WATER AND GAS | 0 | NO FLOW | 288 | 287 | No | -- | -- | Abatement System Follow-Up test. 5 PSI whisper gas and fluid blew down to 0 PSI in seconds. No flow or pressure for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
403411481 | Form 17 | 5/23/2023 | 5/24/2023 | SHUT-IN | 78 | CONTINUOUS | WATER AND GAS | 5 | WHISPER | 359 | 359 | Yes | -- | -- | Annual test. 78 PSI water and gas flow on open, pressure blew down to 5 PSI in 30 minutes. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
403153738 | Form 17 | 8/31/2022 | 9/1/2022 | PLUNGER LIFT | 120 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 309 | 307 | Yes | -- | -- | Annual Test. 120 PSI gas and liquid hydrocarbon blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
|
402719489 | Form 17 | 5/30/2021 | 6/15/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | | 445 | 445 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. |
Click for Specifics | Full | 3/9/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 552 | 540 | No | None | None | |
402564718 | Form 17 | 12/16/2020 | 12/31/2020 | PLUNGER LIFT | 480 | WHISPER | GAS | 0 | NO FLOW | 834 | 834 | No | -- | -- | Abatement system follow up Test, 4805 PSI slight gas whisper blew down to 0 PSI within first 15 min of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 |
402456037 | Form 17 | 4/25/2020 | 7/29/2020 | FLOWING | 190 | GAS | -- | 0 | NO FLOW | 568 | 568 | No | -- | -- | abatement system follow up test, 190 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect sample and submit results if available. PDC will re-test in 6 months |
402439221 | Form 17 | 4/5/2020 | 7/8/2020 | | 195 | WHISPER | -- | 0 | NO FLOW | 569 | 569 | Yes | -- | -- | Annual Test 195 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
402270235 | Form 17 | 12/16/2019 | 12/23/2019 | FLOWING | 300 | GAS | -- | 0 | NO FLOW | 699 | 698 | Yes | Yes | -- | Annual test 300 PSI slight gas flow blew down to 0 PSI after first 10 min of test, no pressure or flow observed for the remainder of the test. PDC has collected a sample and will submit results via form 43 when available. PDC will submit a remediaon plan via sundry. |