| Click for Specifics | Light | 7/2/2025 | 7/7/2025 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 7/9/2024 | 7/15/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 301 | 294 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403310138 | Form 17 | 2/1/2023 | 2/2/2023 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 256 | 255 | No | -- | -- | Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly. |
| 403069889 | Form 17 | 5/25/2022 | 6/7/2022 | PLUNGER LIFT | 12 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 274 | 274 | Yes | -- | -- | Annual Test, 12 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure observed for the remainder of the test. Water present for the duration of the test, approximately 1 quart produced at steady drip. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 9/5/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 308 | 310 | No | None | None | |
| Click for Specifics | Light | 7/19/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 398 | 398 | No | No | No | |
| Click for Specifics | Light | 4/15/2019 | 8/18/2020 | | 5 | | -- | 0 | | 1146 | 1146 | No | No | No | |
| 401327580 | Form 17 | 6/16/2017 | 6/29/2017 | FLOWING | 20 | DOWN TO 0 | -- | 0 | NO FLOW | 1868 | 1868 | No | -- | -- | Post Production Tests. Initial pressure at start of test was 20 PSI, pressure blew down to 0 within first 5 minutes of test and remained at 0 for the duration of test. No sample collected. |
| 401247061 | Form 17 | 3/29/2017 | 3/30/2017 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 1200 | 1200 | No | -- | -- | All sleeves are open due to toe prep. |