| 404583055 | Form 17 | 3/9/2026 | 3/17/2026 | SHUT-IN | 106 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 419 | 419 | No | -- | -- | |
| 404111487 | Form 17 | 2/20/2025 | 2/28/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 294 | 294 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/14/2024 | 4/1/2024 | | 40 | Down to Zero | -- | 0 | No Flow | 261 | 260 | No | No | No | Annual Test. 40 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403349897 | Form 17 | 3/15/2023 | 3/20/2023 | PLUNGER LIFT | 220 | DOWN TO 0 | WATER AND GAS | 20 | WHISPER | 270 | 265 | Yes | -- | -- | Annual Test. 220 PSI water and gas flow blew down to 20 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | | 38 | Down to Zero | -- | 0 | Down to Zero | 308 | 294 | No | No | No | |
| 402815998 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 33 | DOWN TO 0 | -- | 0 | NO FLOW | 334 | 335 | No | -- | -- | Abatement system follow up test, 33 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402789434 | Form 17 | 4/21/2021 | 8/24/2021 | PLUNGER LIFT | 25 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 390 | 390 | No | -- | -- | Annual Test, 25 PSI water and gas flow blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402425805 | Form 17 | 4/27/2020 | 6/18/2020 | | 0 | WHISPER | -- | 0 | VAPOR | 485 | 485 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402236443 | Form 17 | 11/7/2019 | 11/12/2019 | FLOWING | 560 | GAS | -- | 0 | NO FLOW | 672 | 672 | Yes | Yes | -- | Annual Test 560 PSI with gas flow for 20 min of the 30 min test. 0 PSI at the end of the 30 min. PDC has collected a sample and will submit resulta via form 43, PDC Will submit remediation plan via sundry. |
| 401347266 | Form 17 | 7/2/2017 | 7/19/2017 | FLOWING | 580 | CONTINUOUS | -- | 0 | NO FLOW | 2045 | 2044 | No | -- | -- | Post Production test, intitial pressure 580 PSI instantly bled down to 0 PSI no flow for duration of test |
| 401237255 | Form 17 | 2/22/2017 | 3/20/2017 | SHUT-IN | 800 | VAPOR | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |