| 404545327 | Form 17 | 2/6/2026 | 2/13/2026 | PLUNGER LIFT | 250 | CONTINUOUS | GAS | 0 | NO FLOW | 483 | 480 | No | -- | -- | |
| 404111601 | Form 17 | 2/20/2025 | 2/28/2025 | SHUT-IN | 293 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 390 | 390 | No | -- | -- | Remediation follow up test. 293 PSI blew down to 0 PSI within eight minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403713571 | Form 17 | 3/8/2024 | 3/8/2024 | PLUNGER LIFT | 236 | DOWN TO 0 | GAS | 0 | NO FLOW | 376 | 366 | No | -- | -- | Annual test. 236 PSI gas flow blew down to 0 PSI in 2 minutes. No flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403349885 | Form 17 | 3/15/2023 | 3/20/2023 | PLUNGER LIFT | 62 | DOWN TO 0 | GAS | 0 | NO FLOW | 251 | 250 | Yes | -- | -- | Annual Test. 62 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/15/2022 | 4/18/2022 | | 21 | Down to Zero | -- | 0 | No Flow | 331 | 333 | No | No | No | |
| 402816045 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 14 | DOWN TO 0 | WATER H20 | 0 | NO FLOW | 321 | 315 | No | -- | -- | Abatement system follow up test, 14 PSI water flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402789474 | Form 17 | 4/21/2021 | 8/24/2021 | PLUNGER LIFT | 12 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 417 | 417 | No | -- | -- | Annual Test, 12 PSI water flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402425834 | Form 17 | 4/27/2020 | 6/18/2020 | | 0 | WATER H20 | -- | 0 | WHISPER | 495 | 495 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402239577 | Form 17 | 11/7/2019 | 11/14/2019 | PLUNGER LIFT | 290 | CONTINUOUS | -- | 3 | GAS | 763 | 763 | Yes | -- | -- | Annual Test 290 PSI with continous gas flow blew down to 3 PSI slight gas flow at the end of the 30 min test. PDC has collected a gas sample and will submit resulta via form 43 when available. PDC has submitted a remediation plan via sundry |
| 401347345 | Form 17 | 7/2/2017 | 7/19/2017 | FLOWING | 675 | CONTINUOUS | -- | 20 | CONTINUOUS | 1509 | 1509 | Yes | -- | -- | Post Production Test. Initial pressure 675 PSI had continous flow for duration of test, production gas and bradenhead sample taken. |
| 401236941 | Form 17 | 2/22/2017 | 3/20/2017 | SHUT-IN | 500 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |