| 404221914 | Form 17 | 5/12/2025 | 5/29/2025 | PLUNGER LIFT | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 260 | 256 | No | -- | -- | Remediation follow up test. 4 PSI gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/14/2024 | 5/30/2024 | | 28 | Down to Zero | -- | 0 | No Flow | 338 | 341 | No | No | No | Annual Test. 28 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/27/2023 | 7/3/2023 | | 0 | No Flow | -- | 0 | No Flow | 271 | 278 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/25/2022 | 6/13/2022 | | 0 | No Flow | -- | 0 | No Flow | 254 | 253 | No | None | None | |
| Click for Specifics | Full | 10/18/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 335 | 335 | No | None | None | |
| Click for Specifics | Light | 11/23/2020 | 12/14/2020 | | 0 | | -- | 0 | | 650 | 650 | No | No | No | |
| 402613515 | Form 17 | 7/24/2020 | 3/1/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 364 | 366 | No | -- | -- | Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months. |
| 402225128 | Form 17 | 10/26/2019 | 10/29/2019 | FLOWING | 610 | WHISPER | -- | 0 | NO FLOW | 711 | 711 | Yes | Yes | -- | Annual test 610 PSI with gas whisper blew down to 0 PSI within first 10 minutes of test, no pressure or flow observed for the remainder of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry. |
| 401249248 | Form 17 | 3/30/2017 | 4/3/2017 | FLOWING | 10 | CONTINUOUS | -- | 0 | NO FLOW | 2428 | 2427 | No | -- | -- | |