| 404221883 | Form 17 | 5/12/2025 | 5/29/2025 | PLUNGER LIFT | 22 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 286 | 290 | No | -- | -- | Remediation follow up test. 22 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403799367 | Form 17 | 5/14/2024 | 5/21/2024 | PLUNGER LIFT | 8 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 254 | 263 | No | -- | -- | Annual test. 8 PSI water and gas flow blew down to 0 PSI in seconds, water continued to trickle for entire test, ~1 gallon total. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403448723 | Form 17 | 6/27/2023 | 6/28/2023 | PLUNGER LIFT | 20 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 271 | 281 | No | -- | -- | Annual Test. 20 PSI gas blew down to 0 PSI within first few seconds of test. A trickle of water was observed for the first 15 minutes of test. No pressure observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/25/2022 | 6/13/2022 | | 36 | Down to Zero | -- | 0 | No Flow | 229 | 229 | No | None | None | |
| 402735432 | Form 17 | 6/24/2021 | 7/1/2021 | PLUNGER LIFT | 32 | DOWN TO 0 | WATER H20 | 0 | | 312 | 312 | No | -- | -- | Abatement system follow up test, 32 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402735438 | Form 17 | 3/12/2021 | 7/1/2021 | FLOWING | 75 | CONTINUOUS | WATER H20 | 0 | | 341 | 341 | No | -- | -- | Post - Production - Monthly Follow-up. 75 PSI blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402564725 | Form 17 | 12/26/2020 | 12/31/2020 | FLOWING | 62 | DOWN TO 0 | GAS | 0 | NO FLOW | 362 | 362 | No | -- | -- | Abatement System follow up Test, 62 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. |
| Click for Specifics | Light | 11/23/2020 | 12/14/2020 | | 0 | | -- | 0 | | 650 | 650 | No | No | No | |
| 402453057 | Form 17 | 7/24/2020 | 7/27/2020 | | 80 | DOWN TO 0 | -- | 0 | NO FLOW | 379 | 370 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402225144 | Form 17 | 10/22/2019 | 10/29/2019 | FLOWING | 307 | WHISPER | -- | 0 | NO FLOW | 598 | 598 | Yes | Yes | -- | Annual test 307 PSI with slight whisper blew down to 0 PSI within first five minutes of test, no pressure or flow observed for the remainder of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry. |
| 401249216 | Form 17 | 4/6/2017 | 4/27/2017 | FLOWING | 250 | DOWN TO 0 | -- | 0 | NO FLOW | 2112 | 2112 | No | -- | -- | Post Production Test. Pressure at start of test was 250 PSI, gas blew down to zero within first 5 seconds of test, no flow through the remainder of the test. |
| 401122596 | Form 17 | 9/16/2016 | 10/3/2016 | SHUT-IN | 150 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |