LocationLocation ID
WELL05-123-43094Schaumberg
17F-234
PDC ENERGY INC
69175
PR
3/12/2017
WATTENBERG
90750
WELD  123
SWNW 17 5N64W 6
445225
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1509 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404221883Form 175/12/20255/29/2025PLUNGER LIFT22DOWN TO 0 WATER AND GAS0 CONTINUOUS 286290No----Remediation follow up test. 22 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403799367Form 175/14/20245/21/2024PLUNGER LIFT8CONTINUOUS WATER AND GAS0 CONTINUOUS 254263No----Annual test. 8 PSI water and gas flow blew down to 0 PSI in seconds, water continued to trickle for entire test, ~1 gallon total. PDC will monitor pressure and re-test according to bradenhead policy.
403448723Form 176/27/20236/28/2023PLUNGER LIFT20DOWN TO 0 WATER AND GAS0 NO FLOW 271281No----Annual Test. 20 PSI gas blew down to 0 PSI within first few seconds of test. A trickle of water was observed for the first 15 minutes of test. No pressure observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/25/20226/13/2022 36Down to Zero--0No Flow229229NoNoneNone 
402735432Form 176/24/20217/1/2021PLUNGER LIFT32DOWN TO 0 WATER H200  312312No----Abatement system follow up test, 32 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402735438Form 173/12/20217/1/2021FLOWING75CONTINUOUS WATER H200  341341No----Post - Production - Monthly Follow-up. 75 PSI blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402564725Form 1712/26/202012/31/2020FLOWING62DOWN TO 0 GAS0 NO FLOW 362362No----Abatement System follow up Test, 62 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test.
Click for SpecificsLight11/23/202012/14/2020 0 --0 650650NoNoNo 
402453057Form 177/24/20207/27/2020 80DOWN TO 0 --0 NO FLOW 379370No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402225144Form 1710/22/201910/29/2019FLOWING307WHISPER --0 NO FLOW 598598YesYes--Annual test 307 PSI with slight whisper blew down to 0 PSI within first five minutes of test, no pressure or flow observed for the remainder of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry.
401249216Form 174/6/20174/27/2017FLOWING250DOWN TO 0 --0 NO FLOW 21122112No----Post Production Test. Pressure at start of test was 250 PSI, gas blew down to zero within first 5 seconds of test, no flow through the remainder of the test.
401122596Form 179/16/201610/3/2016SHUT-IN150GAS --0 NO FLOW 00No----