| 404221897 | Form 17 | 5/12/2025 | 5/29/2025 | SHUT-IN | 20 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 337 | 336 | No | -- | -- | Remediation follow up test. 20 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403799438 | Form 17 | 5/16/2024 | 5/21/2024 | SHUT-IN | 36 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 277 | 279 | No | -- | -- | Annual test. 36 PSI water and gas flow blew down to 0 PSI in seconds, water was steady stream for entire test, ~3 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403448698 | Form 17 | 6/27/2023 | 6/28/2023 | PLUNGER LIFT | 31 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 249 | 245 | No | -- | -- | Annual Test. 31 PSI gas blew down to 0 PSI within first few seconds of test. A trickle of water was observed throughout test. No pressure observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403240142 | Form 17 | 11/21/2022 | 11/28/2022 | PLUNGER LIFT | 20 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 307 | 307 | Yes | -- | -- | Abatement system follow up test. 20 PSI gas and water flow blew down to 0 PSI within first few seconds of test. Water trickled for entire test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403060127 | Form 17 | 5/25/2022 | 5/26/2022 | PLUNGER LIFT | 56 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 234 | 234 | Yes | -- | -- | Annual Test, 56 PSI water and gas flow blew down to 0 PSI within first minute of test. Water continued for the duration of the test in steady stream. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402735325 | Form 17 | 4/14/2021 | 7/1/2021 | SHUT-IN | 83 | WHISPER | -- | 0 | | 400 | 400 | No | -- | -- | Post-Production - Monthly Follow-up. 83 PSI blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. |
| 402735329 | Form 17 | 3/30/2021 | 7/1/2021 | SHUT-IN | 30 | DOWN TO 0 | WATER H20 | 0 | NO FLOW | 415 | 406 | No | -- | -- | Post-Production - Monthly Follow-up. 30 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402456118 | Form 17 | 7/24/2020 | 7/29/2020 | SHUT-IN | 100 | GAS | -- | 0 | NO FLOW | 480 | 480 | No | -- | -- | Abatement System Follow up test, 100 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
| 402225150 | Form 17 | 10/26/2019 | 10/29/2019 | FLOWING | 200 | DOWN TO 0 | -- | 0 | NO FLOW | 700 | 700 | No | -- | -- | Annual test 200 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry. |
| 401249221 | Form 17 | 3/30/2017 | 4/3/2017 | FLOWING | 140 | DOWN TO 0 | -- | 0 | NO FLOW | 2217 | 2217 | No | -- | -- | |
| 401123238 | Form 17 | 9/16/2016 | 10/4/2016 | SHUT-IN | 320 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |