Click for Specifics | Full | 5/17/2024 | 5/30/2024 | | 11 | Whisper (very low flow) | -- | 0 | Down to Zero | 206 | 203 | No | No | No | Annual Test. 11 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/1/2023 | 5/8/2023 | | 0 | No Flow | -- | 0 | No Flow | 286 | 287 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/26/2022 | 6/13/2022 | | 4 | Down to Zero | -- | 0 | No Flow | 297 | 297 | No | None | None | |
402719180 | Form 17 | 5/15/2021 | 6/15/2021 | SHUT-IN | 0 | NO FLOW | -- | 0 | | 470 | 470 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. |
402545074 | Form 17 | 11/18/2020 | 12/2/2020 | SHUT-IN | 80 | CONTINUOUS | GAS | 0 | NO FLOW | 472 | 472 | No | -- | -- | Abatement System Follow up Test, 80 PSI slight gas blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. |
402448227 | Form 17 | 2/14/2020 | 7/22/2020 | | 60 | DOWN TO 0 | -- | 0 | WHISPER | 565 | 565 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402114770 | Form 17 | 6/30/2019 | 7/18/2019 | FLOWING | 765 | GAS | -- | 0 | NO FLOW | 733 | 733 | Yes | Yes | -- | Annual Test 719 PSI blew down with a slight gas blow down to 0 PSI after 20 min. No pressure or flow observed for the remaining 10 min of test. PDC has colleted a sample and will submit to COGCC via form 43. PDC has submitted a remediation plan via sundry |
401440729 | Form 17 | 10/15/2017 | 10/25/2017 | FLOWING | 820 | DOWN TO 0 | -- | 0 | NO FLOW | 2692 | 2692 | Yes | -- | -- | Post Production Test, blew down within 30 seconds. Sample was collected, requested 14 day blowdown period |
401347780 | Form 17 | 7/14/2017 | 7/19/2017 | SHUT-IN | 750 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion Test initial pressure 750 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test |
401327864 | Form 17 | 5/15/2017 | 6/29/2017 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion test. Initial BH pressure was 0 psi, no flow for duration of test. No sample collected |