Click for Specifics | Full | 5/15/2024 | 5/30/2024 | | 5 | Down to Zero | -- | 0 | No Flow | 268 | 265 | No | No | No | Annual Test. 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403391677 | Form 17 | 5/1/2023 | 5/2/2023 | PLUNGER LIFT | 70 | DOWN TO 0 | GAS | 0 | NO FLOW | 347 | 310 | Yes | -- | -- | Annual test. 70 PSI gas flow blew down to 0 PSI within 5 minutes with no flow or pressure for the remainder of the test. PDC collected a sample 1/03/2023. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/25/2022 | 6/13/2022 | | 23 | Down to Zero | -- | 0 | No Flow | 383 | 363 | No | None | None | |
402858330 | Form 17 | 10/27/2021 | 11/1/2021 | PLUNGER LIFT | 48 | DOWN TO 0 | GAS | 0 | NO FLOW | 441 | 441 | No | -- | -- | Abatement system follow up test, 48 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 9/5/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 490 | 493 | No | None | None | |
402792769 | Form 17 | 11/28/2020 | 8/26/2021 | FLOWING | 70 | CONTINUOUS | GAS | 0 | NO FLOW | 342 | 329 | Yes | -- | -- | Post-production, 70 PSI gas flow blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
Click for Specifics | Light | 7/12/2020 | 12/3/2020 | | 15 | | -- | 0 | No Flow | 314 | 314 | No | No | No | |
Click for Specifics | Light | 6/13/2019 | 8/18/2020 | | 22 | | -- | 0 | | 585 | 585 | No | No | No | |
401440783 | Form 17 | 10/15/2017 | 10/25/2017 | FLOWING | 630 | CONTINUOUS | -- | 0 | NO FLOW | 1797 | 1797 | Yes | Yes | -- | Post Production test, blew down to zero within 5 minutes. Gas Sample collected. REquested 14 day blowdown period |
401347611 | Form 17 | 7/14/2017 | 7/19/2017 | SHUT-IN | 550 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion Test BLEED TO 0 PSI WITHIN 2 MINUTES no flow for duration of test |
401327657 | Form 17 | 5/12/2017 | 6/29/2017 | SHUT-IN | 450 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion test. Initial pressure was 450 PSI, BLEED TO 0 PSI WITHIN A MINUTE, 0 PSI AFTER 30 MINUTES. No Sample COllected due to instant blowdown. |