Surface Casing Depth: 1647 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403799483Form 175/15/20245/21/2024PLUNGER LIFT106DOWN TO 0 GAS0 NO FLOW 390390No----Annual test. 106 PSI gas flow blew down to 0 PSI in seconds, no flow or pressure for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy.
403391650Form 175/1/20235/2/2023PLUNGER LIFT100DOWN TO 0 GAS0 NO FLOW 356357Yes----Annual test. 100 PSI gas flow blew down to 0 PSI within 5 minutes with no flow or pressure for the remainder of the test. PDC collected a gas sample 1/3/2023. PDC will monitor pressure and re-test according to bradenhead policy.
403227646Form 1711/10/202211/14/2022PLUNGER LIFT4DOWN TO 0 GAS0 NO FLOW 245297No----Abatement system follow up test. 4 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403035708Form 175/2/20225/3/2022SHUT-IN71CONTINUOUS GAS0 NO FLOW 449449Yes----Abatement system follow up test, 71 PSI gas flow blew down to 0 PSI within first 20 minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402848486Form 1710/19/202110/21/2021PLUNGER LIFT0NO FLOW --0 NO FLOW 404404No----Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402829695Form 179/22/202110/4/2021 140WHISPER GAS0 NO FLOW 516516Yes----Annual Test, 140 PSI slight water blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402735532Form 171/28/20217/1/2021SHUT-IN787WHISPER --0 NO FLOW 574574No----Post-Production - Monthly Follow-up. 787 PSI whisper blew down to 0 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible.
402735508Form 1711/28/20207/1/2021SHUT-IN30DOWN TO 0 --0  566567No----Post-Production - Monthly Follow-up. 30 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
Click for SpecificsLight7/20/202012/3/2020 15 --0No Flow384384NoNoNo 
Click for SpecificsLight6/13/20198/18/2020 34 --0 670670NoNoNo 
401347624Form 177/14/20177/19/2017SHUT-IN725DOWN TO 0 --0 NO FLOW 00No----Pre Completion Test initial pressure 650 PSI BLEED TO 0 PSI WITHIN SECONDS no flow for duration of test
401327692Form 175/12/20176/29/2017SHUT-IN500DOWN TO 0 --0 NO FLOW 00No----Pre Completion test. Initial pressure was 500 PSI, instantly blew down within first minute of test to 0 PSI. No pressure for remainder of test. Attempted to collect sample but were unable to due instant blow down.