Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-42863Gillham
18Y-312
PDC ENERGY INC
69175
PR
3/1/2022
WATTENBERG
90750
WELD  123
SESE 18 5N64W 6
445032
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1676 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsLight4/22/20255/5/2025 0 --0 208213NoNoNo 
Click for SpecificsFull5/17/20245/30/2024 0Down to Zero--0Down to Zero160163NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/21/20236/28/2023 0Down to Zero--0Down to Zero205210NoNoNo 
Click for SpecificsFull5/26/20226/13/2022 0No Flow--0No Flow218219NoNoneNone 
Click for SpecificsFull6/1/202111/1/2021 0No Flow--0No Flow315309NoNoneNone 
402425494Form 172/20/20206/18/2020 3DOWN TO 0 --0 NO FLOW 418420No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402088067Form 174/30/20196/26/2019FLOWING74GAS --0 NO FLOW 671671No----Annual Test 74 PSI whisper blew down to 0 PSI after 5 minutes, no flow or pressure at the end of the 30 min test . PDC will attempt to collect a sample and will submit via 43 ASAP. PDC has submitted a remediation plan via sundry.
402077759Form 174/18/20196/18/2019SHUT-IN74WHISPER --0 MUD 671686No----Annual Test 74 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401466323Form 1711/14/201711/21/2017FLOWING450CONTINUOUS --8 WHISPER 25862588YesYes--post production test, 450 PSI at start of test blew down to 8PSI after 30 min. Production and bradenhead gas samples collected an will be submitted to the COGCC asap.
401348341Form 177/14/20177/20/2017SHUT-IN550DOWN TO 0 --0 NO FLOW 00No----Pre Completion Test initial pressure 550 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test