Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-42861Gillham
18X-332
PDC ENERGY INC
69175
PR
10/9/2017
WATTENBERG
90750
WELD  123
SESE 18 5N64W 6
445032
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1674 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404226072Form 175/13/20256/2/2025PLUNGER LIFT5DOWN TO 0 WATER H200 CONTINUOUS 207202No----Remediation follow up test. 5 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403799441Form 175/16/20245/21/2024PLUNGER LIFT9WHISPER WATER AND GAS0 WHISPER 167163No----Annual test. 9 PSI grey water and gas flow blew down to 0 PSI in 10 seconds, whisper gas and fluid trickle for entire test, ~1/2 gallon total. PDC will monitor pressure and re-test according to bradenhead policy.
403441854Form 176/21/20236/22/2023PLUNGER LIFT5CONTINUOUS WATER H200 CONTINUOUS 211221No----Annual test. 5 PSI gas and steady stream of fluid at open for 40 seconds. Steady trickle for remainder of test, ~1/2 gallon total. PDC will monitor pressure and re-test according to bradenhead policy.
403069918Form 175/27/20226/7/2022PLUNGER LIFT8CONTINUOUS WATER H200 CONTINUOUS 207207Yes----Annual Test, 8 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402779353Form 178/2/20218/13/2021PLUNGER LIFT11DOWN TO 0 WATER H200 NO FLOW 264264No----Abatement system follow up test, 11 PSI slight water blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402719194Form 172/25/20216/15/2021FLOWING26DOWN TO 0 --0  324324No----Abatement system follow up test, 26 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402735452Form 171/30/20217/1/2021FLOWING60DOWN TO 0 --0  384384No----Post-Production - Monthly Follow-up. 60 PSI blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible.
402440684Form 176/18/20207/9/2020 100DOWN TO 0 --0 WHISPER 399300Yes----Annual Test 100 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
Click for SpecificsLight4/18/20198/18/2020 14 --0 594594NoNoNo 
401348380Form 177/14/20177/20/2017SHUT-IN150DOWN TO 0 --0 NO FLOW 00No----Pre Completion Test initial pressure 150 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test