| 404226072 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 5 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 207 | 202 | No | -- | -- | Remediation follow up test. 5 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403799441 | Form 17 | 5/16/2024 | 5/21/2024 | PLUNGER LIFT | 9 | WHISPER | WATER AND GAS | 0 | WHISPER | 167 | 163 | No | -- | -- | Annual test. 9 PSI grey water and gas flow blew down to 0 PSI in 10 seconds, whisper gas and fluid trickle for entire test, ~1/2 gallon total. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403441854 | Form 17 | 6/21/2023 | 6/22/2023 | PLUNGER LIFT | 5 | CONTINUOUS | WATER H20 | 0 | CONTINUOUS | 211 | 221 | No | -- | -- | Annual test. 5 PSI gas and steady stream of fluid at open for 40 seconds. Steady trickle for remainder of test, ~1/2 gallon total. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403069918 | Form 17 | 5/27/2022 | 6/7/2022 | PLUNGER LIFT | 8 | CONTINUOUS | WATER H20 | 0 | CONTINUOUS | 207 | 207 | Yes | -- | -- | Annual Test, 8 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402779353 | Form 17 | 8/2/2021 | 8/13/2021 | PLUNGER LIFT | 11 | DOWN TO 0 | WATER H20 | 0 | NO FLOW | 264 | 264 | No | -- | -- | Abatement system follow up test, 11 PSI slight water blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402719194 | Form 17 | 2/25/2021 | 6/15/2021 | FLOWING | 26 | DOWN TO 0 | -- | 0 | | 324 | 324 | No | -- | -- | Abatement system follow up test, 26 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402735452 | Form 17 | 1/30/2021 | 7/1/2021 | FLOWING | 60 | DOWN TO 0 | -- | 0 | | 384 | 384 | No | -- | -- | Post-Production - Monthly Follow-up. 60 PSI blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. |
| 402440684 | Form 17 | 6/18/2020 | 7/9/2020 | | 100 | DOWN TO 0 | -- | 0 | WHISPER | 399 | 300 | Yes | -- | -- | Annual Test 100 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 4/18/2019 | 8/18/2020 | | 14 | | -- | 0 | | 594 | 594 | No | No | No | |
| 401348380 | Form 17 | 7/14/2017 | 7/20/2017 | SHUT-IN | 150 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion Test initial pressure 150 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test |