Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-42691Connie
26F-402
PDC ENERGY INC
69175
SI
4/1/2024
WATTENBERG
90750
WELD  123
NWNW 26 5N64W 6
444694
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1467 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404182593Form 174/9/20254/29/2025SHUT-IN0NO FLOW NONE0 NO FLOW 370370No----Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy.
403774303Form 174/19/20244/30/2024 12DOWN TO 0 GAS0 NO FLOW 350350No----Abatement system follow up test. 12 PSI gas flow blew down to 0 PSI within first five minutes of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403391712Form 175/2/20235/2/2023PLUNGER LIFT160DOWN TO 0 GAS0 NO FLOW 414414Yes----Annual test. 160 PSI gas flow blew down to 0 PSI within 5 minutes, no flow or pressure for remainder of test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/16/20226/13/2022 4Down to Zero--0Down to Zero281281NoNoneNone 
402808528Form 179/12/20219/13/2021PLUNGER LIFT0NO FLOW --0 NO FLOW 315315No----Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly.
402754025Form 173/17/20217/20/2021PLUNGER LIFT0NO FLOW --0  376373No----Annual Test, 0 psi with no flow observed for 30 minutes.
402418402Form 174/1/20206/10/2020 1DOWN TO 0 --0 NO FLOW 494495No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
Click for SpecificsLight3/12/20205/11/2020 1 --1 502502NoNoNo 
402074284Form 173/26/20196/13/2019FLOWING110WHISPER --0 DOWN TO 0 611611No----Annual Test 110 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401992160Form 173/26/20194/1/2019FLOWING110WHISPER --0 NO FLOW 611611Yes----Annual bradenhead test 110PSI blew down to zero. PDC will submit remediation proposal via sundry.
401190469Form 171/14/20171/20/2017FLOWING160CONTINUOUS --0 NO FLOW 21912190No---- 
401176782Form 1712/22/20161/3/2017FLOWING90DOWN TO 0 --0 NO FLOW 25402518No---- 
401064250Form 176/8/20166/17/2016SHUT-IN150DOWN TO 0 --0 WHISPER 00No----