| Click for Specifics | Full | 4/23/2025 | 5/5/2025 | | 0 | No Flow | -- | 0 | No Flow | 555 | 556 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/29/2024 | 5/6/2024 | | 0 | No Flow | -- | 0 | No Flow | 272 | 285 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/22/2024 | 4/30/2024 | | 0 | No Flow | -- | 0 | No Flow | 274 | 275 | No | No | No | |
| Click for Specifics | Full | 4/18/2023 | 4/24/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 226 | 222 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| 403135439 | Form 17 | 8/12/2022 | 8/15/2022 | PLUNGER LIFT | 72 | DOWN TO 0 | GAS | 0 | NO FLOW | 233 | 233 | Yes | -- | -- | Annual Test, 72 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402753480 | Form 17 | 5/8/2021 | 7/20/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | | 289 | 289 | No | -- | -- | Annual Test, 0 psi with no flow observed for 30 minutes. |
| Click for Specifics | Light | 8/13/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 296 | 296 | No | No | No | |
| 402418358 | Form 17 | 1/13/2020 | 6/10/2020 | | 0 | NO FLOW | -- | 0 | | 410 | -- | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402059588 | Form 17 | 4/8/2019 | 5/30/2019 | FLOWING | 200 | CONTINUOUS | -- | 10 | CONTINUOUS | 384 | 384 | Yes | Yes | -- | Annual Test, 200 PSI continous flow blew down to 10 PSI after 30 min. PDC has colleted a sample and will submit via 43 when available. A followup sundry porposing a remediation plan will be submitted within 10 days. |