| Click for Specifics | Light | 4/6/2025 | 4/14/2025 | | 0 | | -- | 0 | | 233 | 232 | No | No | No | |
| Click for Specifics | Full | 6/6/2024 | 6/18/2024 | | 0 | No Flow | -- | 0 | No Flow | 300 | 300 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/19/2023 | 6/28/2023 | | 1 | Down to Zero | -- | 0 | Down to Zero | 297 | 300 | No | No | No | |
| Click for Specifics | Full | 8/24/2022 | 9/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 421 | 421 | No | None | None | |
| 402773659 | Form 17 | 6/1/2021 | 8/9/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | | 363 | 363 | No | -- | -- | Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Light | 4/20/2020 | 5/11/2020 | | 0 | | -- | 0 | | 385 | 385 | No | No | No | |
| 402420148 | Form 17 | 4/4/2020 | 6/12/2020 | | 0 | NO FLOW | -- | 0 | NO FLOW | 396 | 396 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402114233 | Form 17 | 6/25/2019 | 7/18/2019 | FLOWING | 70 | DOWN TO 0 | -- | 0 | NO FLOW | 503 | 563 | No | -- | -- | Annual Test 70 PSI blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the 30 min test. PDC will submit a remediation plan via sundry. |