| 404236116 | Form 17 | 5/28/2025 | 6/10/2025 | PLUNGER LIFT | 37 | DOWN TO 0 | GAS | 0 | NO FLOW | 252 | 252 | No | -- | -- | Remediation follow up test. 37 PSI gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403822644 | Form 17 | 6/6/2024 | 6/12/2024 | | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 274 | 273 | No | -- | -- | Remediation follow up test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/19/2023 | 6/28/2023 | | 31 | Down to Zero | -- | 0 | Down to Zero | 286 | 287 | No | No | No | |
| Click for Specifics | Full | 8/24/2022 | 9/6/2022 | | 30 | Down to Zero | -- | 0 | Down to Zero | 359 | 352 | No | None | None | |
| 402787545 | Form 17 | 6/1/2021 | 8/23/2021 | PLUNGER LIFT | 5 | DOWN TO 0 | -- | 0 | NO FLOW | 380 | 380 | No | -- | -- | Annual Test, 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| Click for Specifics | Light | 4/20/2020 | 5/11/2020 | | 37 | | -- | 37 | | 394 | 394 | No | No | No | |
| 402420048 | Form 17 | 4/4/2020 | 6/12/2020 | | 35 | GAS | -- | 0 | NO FLOW | 384 | 383 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402114433 | Form 17 | 6/25/2019 | 7/18/2019 | FLOWING | 200 | DOWN TO 0 | -- | 0 | NO FLOW | 537 | 538 | No | -- | -- | Annual Test 200 PSI blew down to 0 PSI in seconds, no pressure or flow observed for the remainder of the 30 min test. PDC will attempt to collect a sample and submit to COGCC via form 43. PDC has submitted a remediation plan via sundry |