| 404139203 | Form 17 | 3/10/2025 | 3/24/2025 | PLUNGER LIFT | 81 | CONTINUOUS | GAS | 0 | NO FLOW | 436 | 420 | No | -- | -- | Remediation follow up test. 81 PSI blew down to 0 PSI within ten minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403933475 | Form 17 | 9/24/2024 | 9/25/2024 | SHUT-IN | 78 | CONTINUOUS | GAS | 0 | WHISPER | 456 | 465 | No | -- | -- | Ad hoc test. 78 PSI gas flow blew down to 0 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 7/15/2024 | 7/29/2024 | | 3 | Whisper (very low flow) | -- | 0 | Down to Zero | 283 | 281 | No | No | No | Annual Test. 3 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403309940 | Form 17 | 2/1/2023 | 2/2/2023 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 269 | 265 | No | -- | -- | Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 8/22/2022 | 9/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 298 | 296 | No | None | None | |
| Click for Specifics | Full | 8/7/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 334 | 334 | No | None | None | |
| 402425024 | Form 17 | 2/27/2020 | 6/17/2020 | | 0 | WHISPER | -- | 0 | NO FLOW | 468 | 471 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402087579 | Form 17 | 4/29/2019 | 6/25/2019 | FLOWING | 120 | GAS | -- | 0 | NO FLOW | 652 | 652 | No | -- | -- | Annual Test 120 PSI slight gas whisper blew down to 0 PSI after 10 minutes, no flow or pressure after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 401268481 | Form 17 | 3/30/2017 | 4/27/2017 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 2800 | 2805 | No | -- | -- | Post Production Test. Pressure at start of test was 0 and there was no pressure for duration of test |
| 401209739 | Form 17 | 1/9/2017 | 2/14/2017 | SHUT-IN | 560 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |
| 401209695 | Form 17 | 12/30/2016 | 2/14/2017 | SHUT-IN | 600 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |