| 404139179 | Form 17 | 3/11/2025 | 3/24/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 613 | 609 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/9/2024 | 4/16/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 645 | 640 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/12/2023 | 5/22/2023 | | 2 | Down to Zero | -- | 0 | Down to Zero | 599 | 643 | No | None | None | Annual Test. 2 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/3/2022 | 3/14/2022 | | 3 | Down to Zero | -- | 0 | No Flow | 630 | 638 | No | None | None | |
| Click for Specifics | Full | 3/30/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | Down to Zero | 641 | 633 | No | None | None | |
| 402579058 | Form 17 | 11/28/2020 | 1/20/2021 | GAS LIFT | 4 | DOWN TO 0 | -- | 0 | NO FLOW | 634 | 634 | No | -- | -- | 6 Month Abatement System Follow Up Test, 4 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. PDC will continue to monitor pressure on a monthly basis and submit follow up sundry. |
| 402406874 | Form 17 | 3/27/2020 | 5/27/2020 | | 58 | GAS | -- | 0 | | 625 | 625 | Yes | -- | -- | Annual Test 58 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 3/30/2019 | 8/18/2020 | | 6 | | -- | 0 | | 670 | 670 | No | No | No | |
| 401283421 | Form 17 | 5/12/2017 | 5/15/2017 | PLUNGER LIFT | 76 | CONTINUOUS | -- | 0 | NO FLOW | 68 | 68 | No | -- | -- | Medium volume |