Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-39848Mojack
O-28HN
PDC ENERGY INC
69175
PR
10/1/2021
WATTENBERG
90750
WELD  123
NWNE 28 7N64W 6
419243
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1547 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404139179Form 173/11/20253/24/2025PLUNGER LIFT0NO FLOW NONE0 NO FLOW 613609No----Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull4/9/20244/16/2024 0Down to Zero--0Down to Zero645640NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/12/20235/22/2023 2Down to Zero--0Down to Zero599643NoNoneNoneAnnual Test. 2 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull3/3/20223/14/2022 3Down to Zero--0No Flow630638NoNoneNone 
Click for SpecificsFull3/30/202111/1/2021 0Down to Zero--0Down to Zero641633NoNoneNone 
402579058Form 1711/28/20201/20/2021GAS LIFT4DOWN TO 0 --0 NO FLOW 634634No----6 Month Abatement System Follow Up Test, 4 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. PDC will continue to monitor pressure on a monthly basis and submit follow up sundry.
402406874Form 173/27/20205/27/2020 58GAS --0  625625Yes----Annual Test 58 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
Click for SpecificsLight3/30/20198/18/2020 6 --0 670670NoNoNo 
401283421Form 175/12/20175/15/2017PLUNGER LIFT76CONTINUOUS --0 NO FLOW 6868No----Medium volume