Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-39388Kodak North FD
25-040HN
PDC ENERGY INC
69175
PR
4/1/2020
WATTENBERG
90750
WELD  123
SENW 26 6N67W 6
333035
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1532 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404550917Form 172/11/20262/19/2026PLUNGER LIFT17CONTINUOUS GAS0 NO FLOW 571567No---- 
404384709Form 1710/2/202510/8/2025PLUNGER LIFT11CONTINUOUS GAS0 NO FLOW 814814No----Remediation follow up test. 11 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404147539Form 173/19/20253/31/2025PLUNGER LIFT4DOWN TO 0 GAS0 NO FLOW 494287No----Remediation follow up test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull1/20/20251/28/2025 4Down to Zero--0No Flow491485NoNoNoAnnual Test.  4 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull2/13/20242/26/2024Gas Lift20Down to Zero--0Down to Zero351351NoNoNoAnnual Test.  20 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403441864Form 176/20/20236/22/2023PLUNGER LIFT54CONTINUOUS GAS AND LIQUID HYDROCARBON0 NO FLOW 348378Yes----Automation Alert follow-up test. 54 PSI gas and 1/2 cup fluid blew down to 0 PSI in 40 seconds. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull4/20/20235/1/2023 30Down to Zero--0Down to Zero464476NoNoneNoneAnnual Test. 30 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
Click for SpecificsFull10/4/202211/8/2022Plunger Lift43Down to Zero--0Down to Zero396397NoNoneNone 
Click for SpecificsLight11/12/202111/15/2021Plunger Lift1 --0 593590NoNoNoTest per NTO. Whisper on open for 40 seconds and died. No flow for remainder of test.
402357632Form 173/25/20203/31/2020FLOWING6WHISPER --0 NO FLOW 266266No----Test after DOFP. Whisper on open, died in 10 seconds.
402283398Form 171/8/20201/13/2020SHUT-IN0NO FLOW --0 NO FLOW 00No----Test prior to toe-prep/frac.