403926984 | Form 17 | 9/17/2024 | 9/18/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 1325 | 1325 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
Click for Specifics | Full | 4/30/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 1300 | 1300 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 8/1/2023 | 8/14/2023 | Shut In | 0 | No Flow | -- | 0 | No Flow | 1287 | 1288 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
403225295 | Form 17 | 11/9/2022 | 11/10/2022 | SHUT-IN | 6 | DOWN TO 0 | GAS | 0 | NO FLOW | 1281 | 1281 | Yes | -- | -- | Abatement system follow up test. 6 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 7/28/2022 | 8/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 1115 | 1115 | No | None | None | |
402893621 | Form 17 | 12/8/2021 | 12/9/2021 | SHUT-IN | 150 | CONTINUOUS | -- | 0 | NO FLOW | 894 | 894 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 150 PSI blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
402884289 | Form 17 | 11/30/2021 | 12/1/2021 | SHUT-IN | 160 | DOWN TO 0 | -- | 0 | NO FLOW | 862 | 862 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 160 PSI blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 4/21/2021 | 12/21/2021 | | 32 | Continuous | None | 3 | Continuous | 352 | 356 | No | None | None | |
Click for Specifics | Light | 3/29/2020 | 5/11/2020 | | 10 | | -- | 10 | | 325 | 325 | No | No | No | |
Click for Specifics | Light | 3/23/2019 | 8/18/2020 | | 45 | | -- | 0 | | 352 | 352 | No | No | No | |