WELL05-123-38304Guttersen
31Q-401
PDC ENERGY INC
69175
PR
10/1/2024
WATTENBERG
90750
WELD  123
SWSE 31 3N63W 6
434585
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 928 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403926984Form 179/17/20249/18/2024SHUT-IN0NO FLOW --0 NO FLOW 13251325No----Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
Click for SpecificsFull4/30/20245/6/2024 0Down to Zero--0Down to Zero13001300NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull8/1/20238/14/2023Shut In0No Flow--0No Flow12871288NoNoNoAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy.
403225295Form 1711/9/202211/10/2022SHUT-IN6DOWN TO 0 GAS0 NO FLOW 12811281Yes----Abatement system follow up test. 6 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull7/28/20228/9/2022 0Down to Zero--0Down to Zero11151115NoNoneNone 
402893621Form 1712/8/202112/9/2021SHUT-IN150CONTINUOUS --0 NO FLOW 894894Yes----Monthly Gauge High Pressure Follow-Up, 150 PSI blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402884289Form 1711/30/202112/1/2021SHUT-IN160DOWN TO 0 --0 NO FLOW 862862Yes----Monthly Gauge High Pressure Follow-Up, 160 PSI blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull4/21/202112/21/2021 32ContinuousNone3Continuous352356NoNoneNone 
Click for SpecificsLight3/29/20205/11/2020 10 --10 325325NoNoNo 
Click for SpecificsLight3/23/20198/18/2020 45 --0 352352NoNoNo