403923783 | Form 17 | 9/9/2024 | 9/17/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 300 | 300 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
Click for Specifics | Full | 4/30/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 800 | 800 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 8/1/2023 | 8/14/2023 | Shut In | 0 | No Flow | -- | 0 | No Flow | 338 | 338 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 1/27/2022 | 2/21/2022 | | 0 | No Flow | -- | 0 | No Flow | 542 | 542 | No | No | No | |
Click for Specifics | Full | 4/21/2021 | 12/21/2021 | | 8 | No Flow | None | 1 | No Flow | 280 | 270 | No | None | None | |
Click for Specifics | Light | 4/3/2020 | 5/11/2020 | | 10 | | -- | 10 | | 317 | 317 | No | No | No | |
Click for Specifics | Light | 3/23/2019 | 8/18/2020 | | 9 | | -- | 0 | | 212 | 212 | No | No | No | |