Click for Specifics | Light | 1/10/2024 | 2/19/2024 | Flowing | 23 | | -- | 0 | | 467 | 467 | No | No | No | |
Click for Specifics | Light | 8/30/2023 | 9/25/2023 | Plunger Lift | 34 | | -- | 0 | | 540 | 542 | No | No | No | |
403151550 | Form 17 | 8/26/2022 | 8/30/2022 | FLOWING | 15 | DOWN TO 0 | GAS | 0 | NO FLOW | 585 | 602 | No | -- | -- | Mitigation Bradenhead Test
WBD attached
|
Click for Specifics | Light | 4/29/2022 | 5/16/2022 | Flowing | 20 | | -- | 0 | | 589 | 588 | No | No | No | |
402768760 | Form 17 | 7/26/2021 | 8/5/2021 | FLOWING | 18 | DOWN TO 0 | GAS | 0 | NO FLOW | 622 | 624 | No | -- | -- | 18 psig initial surface casing pressure. No samples taken. |
402458554 | Form 17 | 7/30/2020 | 8/8/2020 | FLOWING | 23 | DOWN TO 0 | -- | 0 | NO FLOW | 662 | 659 | No | -- | -- | 23 BHP. Down to 0 w/in 5 min. No samples.
|
402029351 | Form 17 | 3/26/2019 | 5/1/2019 | FLOWING | 105 | WHISPER | -- | 0 | NO FLOW | 817 | 815 | Yes | Yes | No | Bradenhead test per Order No. 1V. 687 - Order 4.b. 105 psig initial surface casing. Down to 0 psig in five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 05-25-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401582549 | Form 17 | 3/19/2018 | 3/22/2018 | SHUT-IN | 276 | WHISPER | -- | 5 | NO FLOW | 1265 | 1289 | Yes | Yes | No | post stim test
Braden whispered and blew down immediately, observed no flow during test |