| 404292693 | Form 17 | 7/14/2025 | 7/24/2025 | SHUT-IN | 2 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 0 | 0 | No | -- | -- | Remediation follow up test. 2 PSI water blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404098357 | Form 17 | 2/6/2025 | 2/18/2025 | SHUT-IN | 12 | DOWN TO 0 | WATER H20 | 0 | WHISPER | 350 | 350 | No | -- | -- | Pre-P&A. 12 PSI gas flow blew down to 0 PSI within thirty minutes. Gas present for entire test. Operator will schedule a sampling event and submit results via form 43. |
| 403866792 | Form 17 | 7/18/2024 | 7/26/2024 | SHUT-IN | 23 | WHISPER | WATER AND GAS | 0 | WHISPER | 226 | 226 | No | -- | -- | Annual test. 23 PSI slight fluid and whisper gas for entire test, ~8 oz total fluid. Fluid quantity insufficient to sample. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403310066 | Form 17 | 2/1/2023 | 2/2/2023 | SHUT-IN | 172 | DOWN TO 0 | GAS | 0 | NO FLOW | 516 | 516 | No | -- | -- | Abatement system follow up test. 172 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403059593 | Form 17 | 5/25/2022 | 5/25/2022 | SHUT-IN | 165 | DOWN TO 0 | GAS | 2 | NO FLOW | 514 | 514 | Yes | -- | -- | Abatement system follow up test, 165 PSI blew down to 2 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC collected a sample 12/07/2021. PDC will continue to monitor monthly. See doc# 402896601 for Wellbore Diagram. |
| 402896599 | Form 17 | 12/12/2021 | 12/13/2021 | SHUT-IN | 98 | DOWN TO 0 | -- | 0 | NO FLOW | 542 | 542 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 98 PSI blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402882079 | Form 17 | 11/29/2021 | 11/30/2021 | SHUT-IN | 65 | DOWN TO 0 | GAS | 0 | NO FLOW | 543 | 543 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 65 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 9/5/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 549 | 549 | No | None | None | |
| 402448786 | Form 17 | 4/15/2020 | 7/22/2020 | | 52 | DOWN TO 0 | -- | 0 | NO FLOW | 565 | 564 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402080966 | Form 17 | 4/15/2019 | 6/19/2019 | SHUT-IN | 50 | CONTINUOUS | -- | 0 | NO FLOW | 589 | 579 | No | -- | -- | Annual Test 50 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 401176687 | Form 17 | 12/22/2016 | 1/3/2017 | PLUNGER LIFT | 360 | GAS | -- | 0 | NO FLOW | 487 | 499 | No | -- | -- | |