Click for Specifics | Full | 5/1/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 348 | 348 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
403381697 | Form 17 | 4/21/2023 | 4/24/2023 | PLUNGER LIFT | 29 | DOWN TO 0 | GAS | 0 | NO FLOW | 331 | 331 | No | -- | -- | Abatement System Follow-up test. 29 PSI gas flow blew down to 0 PSI within 5 minutes. Intermittent fluid produced, ~1 pint. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
403132923 | Form 17 | 8/9/2022 | 8/11/2022 | PLUNGER LIFT | 80 | DOWN TO 0 | GAS | 0 | NO FLOW | 345 | 345 | Yes | -- | -- | Annual Test, 80 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC collected a sample 3/10/2022. PDC will continue to monitor monthly. |
402719569 | Form 17 | 4/12/2021 | 6/15/2021 | PLUNGER LIFT | 2 | DOWN TO 0 | -- | 0 | | 667 | 667 | No | -- | -- | Abatement system follow up test, 2 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
402439625 | Form 17 | 6/30/2020 | 7/8/2020 | | 54 | WATER H20 | -- | 0 | NO FLOW | 580 | 580 | Yes | -- | -- | Annual Test 54 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
Click for Specifics | Light | 6/9/2019 | 11/27/2019 | | 0 | | | 0 | | 625 | 625 | No | No | No | |