Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-37409LaSalle
25G-212
PDC ENERGY INC
69175
SI
7/1/2025
WATTENBERG
90750
WELD  123
SWNW 25 5N65W 6
432889
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 930 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404324362Form 177/28/20258/20/2025SHUT-IN35DOWN TO 0 GAS0 NO FLOW 666666No----Remediation follow up test. 35 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull7/30/20248/6/2024 3Down to Zero--0No Flow442442NoNoNoAnnual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull8/2/20238/14/2023Plunger Lift42Down to Zero--0Down to Zero263282NoNoNoAnnual Test. 42 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/7/20227/6/2022 10Down to Zero--0Down to Zero250254NoNoneNone 
402789551Form 178/21/20218/24/2021PLUNGER LIFT11DOWN TO 0 GAS0 NO FLOW 489489No----Abatement system follow up test, 11 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402789567Form 1711/20/20208/24/2021PLUNGER LIFT130CONTINUOUS GAS0 NO FLOW 368368Yes----Post-production, 130 PSI gas flow blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43.
Click for SpecificsLight10/16/202012/3/2020 35 --0No Flow412412NoNoNo 
Click for SpecificsLight9/19/20198/18/2020 0 --0 590590NoNoNo