| Click for Specifics | Light | 2/27/2025 | 3/4/2025 | | 0 | | -- | 0 | | 721 | 721 | No | No | No | |
| Click for Specifics | Full | 3/25/2024 | 4/3/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/17/2023 | 4/24/2023 | | 0 | No Flow | -- | 0 | No Flow | 271 | 260 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/8/2022 | 3/14/2022 | | 0 | No Flow | -- | 0 | No Flow | 285 | 287 | No | None | None | |
| 402789797 | Form 17 | 5/18/2021 | 8/24/2021 | PLUNGER LIFT | 1 | DOWN TO 0 | -- | 0 | NO FLOW | 373 | 373 | No | -- | -- | Annual Test, 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402415715 | Form 17 | 2/24/2020 | 6/8/2020 | | 0 | NO FLOW | -- | 0 | NO FLOW | 281 | 0 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402091708 | Form 17 | 6/4/2019 | 6/28/2019 | PLUNGER LIFT | 50 | DOWN TO 0 | -- | 0 | NO FLOW | 642 | 342 | No | -- | -- | Annual 50 Test PSI whisper blew down to 0 PSI instantly no pressure or flow after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry |