Click for Specifics | Full | 5/1/2024 | 5/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 268 | 268 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 6/7/2023 | 6/12/2023 | | 0 | No Flow | -- | 0 | No Flow | 195 | 200 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
402921236 | Form 17 | 1/8/2022 | 1/10/2022 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 169 | 169 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 5/15/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 300 | 300 | No | None | None | |
Click for Specifics | Light | 1/26/2020 | 12/14/2020 | | 6 | | -- | 0 | No Flow | 767 | 767 | No | No | No | |
Click for Specifics | Light | 6/27/2019 | 8/18/2020 | | 0 | | -- | 0 | | 207 | 207 | No | No | No | |