| Click for Specifics | Full | 10/22/2025 | 11/11/2025 | | 41 | Continuous | Water | 0 | No Flow | 288 | 284 | No | N | N | Surface Casing produced Water. Water insufficient for sampling. |
| Click for Specifics | Full | 8/22/2024 | 9/11/2024 | | 34 | Continuous | Water | -- | No Flow | 227 | 225 | No | N | N | Surface Casing produced Water. Water insufficient for sampling. |
| Click for Specifics | Full | 11/21/2023 | 12/11/2023 | Plunger Lift | 15 | Continuous | Water | -- | No Flow | 236 | 239 | No | N | N | Surface Casing produced Water. Water insufficient for sampling. |
| Click for Specifics | Full | 10/3/2022 | 11/8/2022 | Plunger Lift | 14 | Continuous | None | -- | Whisper | 291 | 291 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 8/4/2021 | 9/13/2021 | Plunger Lift | 11 | Continuous | None | -- | No Flow | 317 | 318 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 11/12/2020 | 12/21/2020 | Plunger Lift | 1 | WHISPER | -- | -- | DOWN TO 0 | 0 | 0 | No | No | No | Tubing and Casing dead. Surface Casing produced no liquid. |
| Click for Specifics | Full | 12/4/2019 | 12/20/2019 | | 0 | Down To Zero | -- | 0 | Down To Zero | 340 | 340 | No | No | No | Tubing shut in. Surface casing produced no liquids. |
| 400991268 | Form 17 | 5/13/2014 | 2/17/2016 | PLUNGER LIFT | 31 | GAS | -- | >0 | DOWN TO 0 | -- | -- | No | -- | -- | CASING INACCESSIBLE---SC produced no fluid during form 17 test. Frac valves were stabbed on tubing. |