| 404359818 | Form 17 | 9/10/2025 | 9/18/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 346 | 346 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed for entire of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403935567 | Form 17 | 9/25/2024 | 9/26/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/13/2023 | 9/18/2023 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 602 | 602 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/13/2023 | 9/25/2023 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 602 | 602 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/17/2022 | 11/29/2022 | | 3 | Down to Zero | -- | 0 | Down to Zero | 472 | 472 | No | None | None | |
| 402810345 | Form 17 | 9/9/2021 | 9/14/2021 | PLUNGER LIFT | 3 | DOWN TO 0 | -- | 0 | NO FLOW | 547 | 547 | No | -- | -- | Annual Test, 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402721026 | Form 17 | 4/20/2021 | 6/16/2021 | PLUNGER LIFT | 1 | DOWN TO 0 | -- | 0 | | 609 | 609 | No | -- | -- | Abatement system follow up test, 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402473566 | Form 17 | 8/22/2020 | 8/24/2020 | | 140 | VAPOR | -- | 0 | VAPOR | 450 | 450 | Yes | -- | -- | Annual Test 140 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 8/6/2019 | 11/27/2019 | | 35 | | | 0 | No Flow | 1000 | 1000 | No | No | No | |