Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-34647SRC Bestway
B-2-11-14NBHZM
PDC ENERGY INC
69175
PR
9/1/2024
WATTENBERG
90750
GREELEY/WELD  123
SENE 2 5N66W 6
423325
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1237 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404365173Form 179/10/20259/23/2025PLUNGER LIFT1CONTINUOUS GAS0 NO FLOW 392400No----Remediation follow up test. 1 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
403935597Form 179/25/20249/26/2024PLUNGER LIFT156CONTINUOUS GAS2 WHISPER 584558No----Annual test. 156 PSI gas flow blew down to 2 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy.
403529643Form 179/13/20239/14/2023PLUNGER LIFT114CONTINUOUS WATER AND GAS0 WHISPER 418417Yes----Annual test. 114 PSI gas and 1 cup water on open. Whisper gas for entire test, blew down to 0 PSI in 30 minutes. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403260657Form 1712/8/202212/14/2022PLUNGER LIFT35DOWN TO 0 GAS0 NO FLOW 366361No----Annual Test. 35 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
Click for SpecificsFull7/4/202111/1/2021 0No Flow--0No Flow564564NoNoneNone 
402426126Form 175/18/20206/18/2020 0DOWN TO 0 --0 NO FLOW 894894No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402450006Form 1710/15/20197/23/2020 320GAS --0 WHISPER 11751175Yes----Annual Test 320 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
402211435Form 1710/15/201910/17/2019SHUT-IN320GAS --0 WHISPER 11751175No----Blew gas from 0 - 18 minutes, then down to a whisper