| 404360188 | Form 17 | 9/10/2025 | 9/18/2025 | SHUT-IN | 1 | CONTINUOUS | GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Remediation follow up test. 1 PSI gas, blew down to 0 in thirty minutes, liquid hydrocarbons observed 15 minutes into test but switched back to gas. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403935602 | Form 17 | 9/25/2024 | 9/26/2024 | SHUT-IN | 66 | CONTINUOUS | GAS | 9 | SURGE | 0 | 0 | No | -- | -- | Remediation follow up test. 66 PSI gas flow blew down to 9 PSI in 30 minutes. Gas and fluid started surging after initial gas was off, ~2 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403529656 | Form 17 | 9/13/2023 | 9/14/2023 | PLUNGER LIFT | 68 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 577 | 578 | Yes | -- | -- | Annual test. 68 PSI water and gas flow blew down to 0 PSI in 30 minutes, ~8 gallons total. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/17/2022 | 11/29/2022 | | 10 | Down to Zero | -- | 0 | Down to Zero | 411 | 419 | No | None | None | |
| 402721164 | Form 17 | 5/26/2021 | 6/16/2021 | PLUNGER LIFT | 4 | WHISPER | WATER AND VAPOR | 1 | | 413 | 413 | No | -- | -- | Abatement system follow up test, 4 PSI blew down to 1 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. |
| 402721148 | Form 17 | 4/22/2021 | 6/16/2021 | PLUNGER LIFT | 3 | DOWN TO 0 | -- | 0 | | 510 | 510 | No | -- | -- | Abatement system follow up test, 3 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402565081 | Form 17 | 12/29/2020 | 1/4/2021 | PLUNGER LIFT | 60 | CONTINUOUS | GAS | 0 | NO FLOW | 409 | 409 | No | -- | -- | Abatement system follow up Test, 60 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. |
| 402503370 | Form 17 | 9/28/2020 | 10/5/2020 | | 72 | CONTINUOUS | -- | 0 | DOWN TO 0 | 638 | 456 | Yes | -- | -- | Annual Test 72 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry |
| Click for Specifics | Light | 8/22/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 600 | 600 | No | No | No | |
| 402242659 | Form 17 | 11/11/2019 | 11/19/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | WATER H20 | 1065 | 1065 | Yes | -- | Yes | Annual bradenhead testing. Well flowed water during test. Fluid will be sampled and test results will be uploaded into EDD when available. |