Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-34639SRC Bestway
14-2-11-14NAHZM
PDC ENERGY INC
69175
PR
9/1/2024
WATTENBERG
90750
GREELEY/WELD  123
SENE 2 5N66W 6
423325
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1245 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404376069Form 179/11/202510/1/2025FLOWING0NO FLOW NONE0 NO FLOW 709708No----Remediation follow up test. 0 PSI, no pressure or flow observed for entire of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404150618Form 173/27/20254/2/2025PLUNGER LIFT28DOWN TO 0 GAS0 NO FLOW 691691No----Remediation follow up test. 28 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
403983809Form 1710/31/202411/6/2024 51DOWN TO 0 GAS0 WHISPER 639640No----Engineering Ad Hoc test. 51 PSI whisper gas blew down to 0 PSI in a few seconds, whisper gas observed for entire test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
403935700Form 179/25/20249/26/2024PLUNGER LIFT25CONTINUOUS GAS2 WHISPER 628628No----Annual Test. 25 PSI gas flow blew down to 2 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy.
403694734Form 172/21/20242/22/2024SHUT-IN52CONTINUOUS GAS0 WHISPER 545545No----Automation Alert follow-up test. 52 PSI gas flow blew down to whisper after 3 minutes. Whisper/light vapor for entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull9/14/20239/18/2023Plunger Lift18Down to Zero--0Down to Zero368370NoNoNoAnnual Test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull9/14/20239/25/2023Plunger Lift18Down to Zero--0Down to Zero368370NoNoNoAnnual Test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull11/10/202211/29/2022 32Down to Zero--0Down to Zero424414NoNoneNone 
Click for SpecificsFull7/4/202111/1/2021 10Down to Zero--0No Flow10221022NoNoneNone 
Click for SpecificsLight8/21/202012/3/2020 37 --0No Flow925925NoNoNo 
Click for SpecificsLight6/5/201911/27/2019 4  0No Flow11101110NoNoNo