| 402741244 | Form 17 | 3/1/2021 | 7/8/2021 | SHUT-IN | 120 | CONTINUOUS | GAS | 0 | WHISPER | 950 | 950 | Yes | -- | -- | Pre P&A, 120 PSI continuous gas and water flow blew down to 0 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402871637 | Form 17 | 1/21/2021 | 11/16/2021 | SHUT-IN | 110 | CONTINUOUS | GAS AND VAPOR | 0 | NO FLOW | 980 | 980 | Yes | -- | -- | Post-production, 110 PSI vapor and gas flow blew down to 0 PSI within 10 minutes. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402871645 | Form 17 | 12/31/2020 | 11/16/2021 | SHUT-IN | 120 | CONTINUOUS | VAPOR | 2 | WHISPER | 1000 | 1000 | Yes | -- | -- | Post-production, 120 PSI vapor flow blew down to 2 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402871657 | Form 17 | 11/21/2020 | 11/16/2021 | SHUT-IN | 112 | CONTINUOUS | GAS | 0 | NO FLOW | 972 | 972 | Yes | -- | -- | Post-production, 112 PSI gas flow blew down to 0 PSI within 10 minutes. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402493738 | Form 17 | 9/16/2020 | 9/21/2020 | | 100 | CONTINUOUS | -- | 0 | WHISPER | 968 | 968 | Yes | -- | -- | Annual Test 100 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402242368 | Form 17 | 11/8/2019 | 11/18/2019 | PLUNGER LIFT | 125 | GAS | -- | 30 | CONTINUOUS | 780 | 780 | Yes | -- | Yes | Annual bradenhead testing. Opened bradenhead valve, blew gas and began surging water at 5 minutes. Bradenhead will be sampled and results to be uploaded into EDD when available. |