| 403674204 | Form 17 | 1/31/2024 | 2/1/2024 | SHUT-IN | 30 | CONTINUOUS | GAS | TSTM | WHISPER | 0 | 0 | No | -- | -- | Annual test. 30 PSI whisper gas for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403618578 | Form 17 | 12/4/2023 | 12/7/2023 | SHUT-IN | 250 | CONTINUOUS | GAS | 0 | CONTINUOUS | 680 | 680 | No | -- | -- | Pre-P&A. 250 PSI continuous gas flow blew down to 0 PSI within thirty minutes. |
| 403548100 | Form 17 | 9/28/2023 | 10/3/2023 | SHUT-IN | 15 | CONTINUOUS | GAS | 0 | CONTINUOUS | 141 | 141 | Yes | -- | -- | Pre P&A. 15 PSI continuous whisper gas blew down to 0 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Full | 1/5/2023 | 1/17/2023 | | 0 | No Flow | -- | 0 | No Flow | 860 | 860 | No | None | None | |
| 403005587 | Form 17 | 4/5/2022 | 4/6/2022 | SHUT-IN | 55 | DOWN TO 0 | VAPOR | 0 | WHISPER | 250 | 250 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 55 PSI vapor flow blew down to 0 PSI within first minute of test. Vapor present for the duration of the test, no pressure observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402971941 | Form 17 | 3/2/2022 | 3/3/2022 | SHUT-IN | 24 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 0 | 0 | No | -- | -- | Abatement system follow up test, 24 PSI vapor flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402865464 | Form 17 | 8/16/2021 | 11/9/2021 | SHUT-IN | 64 | WHISPER | GAS AND VAPOR | 0 | NO FLOW | 0 | 0 | Yes | -- | -- | Post-production, 64 PSI whisper vapor and gas blew down to 0 PSI within first 10 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402719976 | Form 17 | 3/3/2021 | 6/16/2021 | SHUT-IN | 8 | CONTINUOUS | WATER AND VAPOR | 0 | CONTINUOUS | 900 | 900 | No | -- | -- | Abatement system follow up test, 8 PSI continuous vapor and water flow blew down to 0 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. |
| 402464069 | Form 17 | 7/30/2020 | 8/11/2020 | | 66 | WHISPER | -- | 0 | WHISPER | 900 | 900 | Yes | -- | -- | Annual Test 66 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402242380 | Form 17 | 11/8/2019 | 11/18/2019 | PLUNGER LIFT | 75 | GAS | -- | 0 | NO FLOW | 650 | 645 | Yes | Yes | -- | Annual bradenhead test. Bradenhead blew gas for 5 minutes down to zero. Bradenhead will be sampled and results to be uploaded into EDD when available. |