| 402878503 | Form 17 | 11/22/2021 | 11/23/2021 | SHUT-IN | 93 | CONTINUOUS | WATER AND MUD | 37 | CONTINUOUS | 701 | 701 | Yes | -- | -- | Pre P&A, 98 PSI continuous mud and water flow blew down to 37 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Full | 5/26/2021 | 11/1/2021 | | 11 | Down to Zero | -- | 0 | Water H2O | 691 | 691 | No | None | None | |
| 402610714 | Form 17 | 10/16/2020 | 2/25/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 662 | 662 | No | -- | -- | Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months. |
| Click for Specifics | Light | 7/19/2020 | 12/3/2020 | | 42 | | -- | 0 | No Flow | 644 | 644 | No | No | No | |
| 402449844 | Form 17 | 11/9/2019 | 7/23/2020 | | 70 | GAS | -- | 7 | GAS | 570 | 575 | Yes | -- | -- | Annual Test 70 PSI with continuous flow, blew down to 7 PSI after 30 min.
PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via
sundry. |
| 402242638 | Form 17 | 11/9/2019 | 11/18/2019 | PLUNGER LIFT | 70 | GAS | -- | 7 | CONTINUOUS | 570 | 575 | Yes | Yes | -- | Annual bradenhead testing. Bradenhead gas flowed continuously during test. Gas was sampled and results will be uploaded into the EDD when available. |