| 404189856 | Form 17 | 4/17/2025 | 5/5/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 450 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/13/2025 | 1/28/2025 | | 0 | | -- | 0 | | 669 | 670 | No | No | No | |
| Click for Specifics | Full | 1/10/2024 | 1/18/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 609 | 609 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/7/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 818 | 818 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/26/2022 | 8/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 507 | 507 | No | None | None | |
| Click for Specifics | Full | 6/10/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 586 | 586 | No | None | None | |
| Click for Specifics | Light | 8/23/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 803 | 803 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 524 | 524 | No | No | No | |
| 400416663 | Form 17 | 4/24/2013 | 5/10/2013 | PLUNGER LIFT | 26 | GAS | -- | 0 | DOWN TO 0 | 506 | 511 | No | -- | -- | Surface casing produced no fluids during 30 min. test. |